3 Hour Long build time in DAVE!

Tip / Sign in to post questions, reply, level up, and achieve exciting badges. Know more

cross mob
Not applicable
Hi all, I'm a first time user and I'm attempting to flash my XMC4200 according to the intructions in “Sense2Go_Instruction_Manual__Flashing_XMC4200_With_RADAR_Software.pdf”.

I've followed the Steps up to Step 5 but it seems to be taking forever (over 3 hours) to build. Is there something that I've done wrong?

Thanks
0 Likes
3 Replies
Not applicable
Ok. It finished building. Would still love to know if it was supposed to take so long (+3hrs)?!
0 Likes
Not applicable
2603.attach

9 hours build time... I feel like I'm definitely doing something wrong?!
0 Likes
Not applicable
Hi kim.b.f.white

I fear I do not have the solution for you but I can assure you that our feeling is right. My builds do not take longer than ~ 1 minute (DAVE 4) although the program is quite complex including CMSIS_DSP libs.
Some thoughts:
- work on your local hard drive
- make sure DAVE has enough RAM available
- use "build active project" not "rebuilt active project" - this only compiles the changes you made
0 Likes